NEW QUESTION 33
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Reduce the planning window.
- C. Select an alternative mode on a resource.
- D. Form optimum sequences to reduce setup times.
- E. Execute a new production planning run.
Answer: A,C,D
NEW QUESTION 34
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements without checking the capacity of a work center.
- D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
Answer: C
NEW QUESTION 35
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Make-to-stock production (10)
- C. Make-to-order production (20)
- D. Planning without final assembly (50)
Answer: A
NEW QUESTION 36
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?
- A. Production order release
- B. Kanban
- C. Back flushing
- D. Material requirements planning
Answer: D
NEW QUESTION 37
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.
- A. Wait time
- B. Float after production
- C. Goods receipt processing time
- D. Queue time
- E. Move time
Answer: B,D,E
NEW QUESTION 38
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Picking list
- B. Transfer Order
- C. Kanban
- D. Backflushing
Answer: A
NEW QUESTION 39
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Whether a material master fieldis required, changeable, displayed, or hidden
- B. Which material master views can be maintained
- C. Whether material numbers are assigned internally or externally
- D. Which transaction you can use to create a new material
Answer: A,B
NEW QUESTION 40
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning without final assembly (50)
- B. Planning at assembly level (70)
- C. Make-to-order production (20)
- D. Planning with final assembly (40)
Answer: A
NEW QUESTION 41
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Material Requirements Planning (MRP)
- C. Capacity Requirements Planning (CRP)
- D. Integrated Business Planning (IBP)
Answer: A,D
NEW QUESTION 42
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Repetitive manufacturing profile
- C. Routing
- D. Production cost collector
Answer: A,C
NEW QUESTION 43
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
- A. When the MRP results are saved
- B. When you create a sales order
- C. When you create a planned order
- D. When you deliver a sales order
Answer: B
NEW QUESTION 44
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To reduce the number of material masters
- B. Tosimplify the structure of bills of material
- C. To reduce the number of changes required in bills of material
- D. To increase the number of planning levels
- E. To make the assignment of components easier
Answer: B,C,E
NEW QUESTION 45
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the operation using lead the scheduling.
- B. You canreschedule the order using material requirements planning.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the order using lead time scheduling.
Answer: C
NEW QUESTION 46
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a propagation range.
- B. Use a planning group.
- C. Use a heuristic.
- D. Use a resource group.
Answer: C
NEW QUESTION 47
Where do you maintain the duration of a producton operation?
- A. Material master
- B. Routing
- C. Bill of material (BOM)
- D. Work instructions
Answer: B
NEW QUESTION 48
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Manual planning without check
- B. Consumption-based planning
- C. Forecast planning
- D. Material requirements planning
Answer: B
NEW QUESTION 49
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. Past procurement quantities
- B. Past quotation quantities
- C. One-off events
- D. Past sales order quantities
- E. Market intelligence
Answer: C,D,E
NEW QUESTION 50
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
- D. The lot size range must be within the lot-size range of the assigned routing.
- E. The assigned routing must be a rate routing.
Answer: A,C,D
NEW QUESTION 51
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Yellow
- C. Top of Red Base
- D. Top of Green
Answer: D
NEW QUESTION 52
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with more than one work center
- B. A production line with prioritized alternative work centers
- C. A production line with an alternative sequence in the routing
- D. A production line with a parallel sequence in the routing
Answer: A
NEW QUESTION 53
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.
- A. It is used by ATP to determine the priority of alternative components.
- B. It is used in MRP to determine the sequence in which materials are planned.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by product costing to determine how costs are rolled up.
Answer: B,D
NEW QUESTION 54
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
- A. Squeezing
- B. Find Slot
- C. Scheduling working time only
- D. Insert operation
Answer: B
NEW QUESTION 55
Which of the following is a valid sequence of the main activities in product on order processing?
- A. Creation, staging, release, material withdrawal, confirmation
- B. Creation, scheduling, release, variance calculation, confirmation
- C. Creation, scheduling, release, material withdrawal, confirmation