NEW QUESTION 22
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Yellow
  • C. Top of Red Base
  • D. Top of Green

Answer: D

 

NEW QUESTION 23
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of goods receipt for the product
  • B. Posting of production costs to the production cost collector
  • C. Archiving of documents for assembly scrap
  • D. Material staging for next order in sequence
  • E. Reduction of associated capacity requirements

Answer: A,B,E

 

NEW QUESTION 24
What is the difference between co-products and by-products?

  • A. Only co-products appear in the processor production order settlement rule.
  • B. Only co-products are identified by a special item category in the bill of material (BOM).
  • C. Only by-products have a zero inventory valuation.
  • D. Onlyco-products can be manufactured in isolation from the main product.

Answer: A

 

NEW QUESTION 25
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. In-house production time
  • B. Total replenishment lead time
  • C. Operation duration
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 26
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Squeezing
  • B. Find Slot
  • C. Scheduling working time only
  • D. Insert operation

Answer: B

 

NEW QUESTION 27
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, staging, release, material withdrawal, confirmation
  • B. Creation, scheduling, release, variance calculation, confirmation
  • C. Creation, scheduling, release, material withdrawal, confirmation
  • D. Creation, release, scheduling, material withdrawal, confirmation

Answer: C

 

NEW QUESTION 28
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past procurement quantities
  • B. Past quotation quantities
  • C. One-off events
  • D. Past sales order quantities
  • E. Market intelligence

Answer: C,D,E

 

NEW QUESTION 29
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Alphanumeric or quota arrangement
  • B. Lot size or material cost
  • C. Planned order or materialnumber
  • D. Validity period or sales order

Answer: A

 

NEW QUESTION 30
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Production supply area
  • C. Rate routing
  • D. Replenishment strategy

Answer: A

 

NEW QUESTION 31
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Controller
  • C. MRP Group
  • D. MRP Profile

Answer: C

 

NEW QUESTION 32
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When the MRP results are saved
  • B. When you create a sales order
  • C. When you create a planned order
  • D. When you deliver a sales order

Answer: B

 

NEW QUESTION 33
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Manual planning without check
  • B. Consumption-based planning
  • C. Forecast planning
  • D. Material requirements planning

Answer: B

 

NEW QUESTION 34
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To reduce the number of material masters
  • B. Tosimplify the structure of bills of material
  • C. To reduce the number of changes required in bills of material
  • D. To increase the number of planning levels
  • E. To make the assignment of components easier

Answer: B,C,E

 

NEW QUESTION 35
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.

  • A. The display template for material numbers applies to all clients.
  • B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • C. In Customizing you can decide by material type whether to use the long material number.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: A,B

 

NEW QUESTION 36
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the safety stock level
  • C. Fill up to the reorder stock level
  • D. Fill up to the maximum stock level

Answer: A

 

NEW QUESTION 37
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Reduce the planning window.
  • C. Select an alternative mode on a resource.
  • D. Form optimum sequences to reduce setup times.
  • E. Execute a new production planning run.

Answer: A,C,D

 

NEW QUESTION 38
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the operation using lead the scheduling.
  • B. You canreschedule the order using material requirements planning.
  • C. You can reschedule the operation using finite Scheduling in a planning board.
  • D. You can reschedule the order using lead time scheduling.

Answer: C

 

NEW QUESTION 39
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a propagation range.
  • B. Use a planning group.
  • C. Use a heuristic.
  • D. Use a resource group.

Answer: C

 

NEW QUESTION 40
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Fixed pegging (on/off)
  • B. Finiteness level (0...1)
  • C. Planning mode (bucket/sequence)
  • D. Direction (forward/backward)
  • E. Scheduling control (finite/infinite)

Answer: C,D,E

 

NEW QUESTION 41
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Make-to-stock production (10)
  • C. Make-to-order production (20)
  • D. Planning without final assembly (50)

Answer: A

 

NEW QUESTION 42
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP controller
  • C. MRP group
  • D. MRP type

Answer: B

 

NEW QUESTION 43
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • B. The assigned routing must NOT have alternative sequences.
  • C. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • D. The lot size range must be within the lot-size range of the assigned routing.
  • E. The assigned routing must be a rate routing.

Answer: A,C,D

 

NEW QUESTION 44
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the production version
  • B. In the production order type
  • C. In the MRP controller
  • D. In the routing
  • E. In the bill of materials (BOM)

Answer: B,C,D

 

NEW QUESTION 45
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

  • A. Use the minimum order quantity.
  • B. Use the MRP type for vendor managed inventory.
  • C. Use the fixed lot size procedure.
  • D. Use the reorder point.

Answer: C

 