NEW QUESTION # 169
A company is in a multi-products, competitive market. Which of the following is the MOST appropriate strategy to help capture the maximum market share?
Response:

  • A. Reducing cycle time while introducing new, reliable products.
  • B. Improving the capacity of manufacturing process.
  • C. Performing aggressive field-testing.
  • D. Increasing the reliability of current product

Answer: A


NEW QUESTION # 170
An employee is injured on the job. The employer has proven to have a good safety and health program.
Generally the employee has which of the following options available to him/her?
Response:

  • A. Caveat venditor.
  • B. Contributory negligence.
  • C. Caveat emptor.
  • D. Workman's compensation.

Answer: D


NEW QUESTION # 171
The two principal measures of failure during risk assessment are which of the following?
Response:

  • A. Failure mode and failure mechanism.
  • B. Failure analysis and failure effects.
  • C. Failure method and failure mode.
  • D. Failure severity and failure probability.

Answer: D


NEW QUESTION # 172
Which of the following is a continuous probability distribution?
Response:

  • A. Poisson
  • B. Binomial
  • C. Weibull
  • D. Hypergeometric

Answer: C


NEW QUESTION # 173
A high incidence of failures has developed during aircraft acceptance testing. The identified failure is that an instrument panel light has malfunctioned on 6 of the last 10 aircraft tested.
This problem needs to be investigated and a Failure Reporting and Corrective Action System (FRACAS) needs to be completed without stopping aircraft production.
If the cause of the failure is determined to be a faulty subassembly manufactured only by a single supplier, and this situation is threatening to shut down aircraft production, the next step should be to Response:

  • A. Initiate a supplier corrective action and return all of the unsorted inventory.
  • B. Issue a Government and Industry Data Exchange Program (GIDEP) alert.
  • C. Update the inspection instruction and retrain receiving inspection.
  • D. Visit the supplier to assist in determining the root cause of the problem.

Answer: D


NEW QUESTION # 174
A go/no-go device is tested until it fails. If X is the number of tests to first failure with no wear out present, and the probability of success on each test is .99, then the probability that X is greater than 5 is:
Response:

  • A. 0.9310
  • B. 0.9510
  • C. 0.9610
  • D. 0.9410

Answer: B


NEW QUESTION # 175
Root cause failure analysis is necessary to identify and correct basis problems. Usually a priority of failure mode is established. This classic or traditional approach to improvement results in which of the following?
Response:

  • A. Special cause reduction.
  • B. Defect reduction.
  • C. Zero defects.
  • D. Catastrophic problem reduction.

Answer: B


NEW QUESTION # 176
The distribution used to describe the time between failures which occur independently and at a constant rate, is the:
Response:

  • A. Exponential.
  • B. Log normal.
  • C. Gamma.
  • D. Weibull.

Answer: A


NEW QUESTION # 177
Highly repetitive operations should be assigned to:
Response:

  • A. An operator assisted by a computer.
  • B. An operator.
  • C. A machine and operator performing the same task alternately.
  • D. A machine.

Answer: D


NEW QUESTION # 178
Concurrent engineering means
Response:

  • A. Use of inputs from all technical disciplines early and simultaneously.
  • B. An electrical engineering term.
  • C. Alternate designs being generated in parallel.
  • D. Engineers working in tandem shifts to speed the process.

Answer: A


NEW QUESTION # 179
It is often observed that unscheduled maintenance:
Response:

  • A. Does not necessarily isolate failure causes.
  • B. Isolates failure causes more quickly than scheduled maintenance.
  • C. Always isolates the specific causes of failure.
  • D. Never isolates the specific causes of failure.

Answer: A


NEW QUESTION # 180
Human factors are important considerations when designing for reliability because:
I. Habits are sometimes difficult to change.
II. Conditions such as lighting and heating influence performance.
III. Weak parts must be easily replaceable.
IV. Age and skill can limit one's ability to use equipment correctly.
Response:

  • A. I and III only
  • B. II and III only
  • C. II, III and IV only
  • D. I, II, III and IV

Answer: D


NEW QUESTION # 181
When a new system is being developed, which of the following will be LEAST effective in speeding up the system reliability growth process?
Response:

  • A. Performing accelerating testing.
  • B. Testing the system first to find the failed components.
  • C. Attaining components reliability prior to the system test.
  • D. Performing systems testing and component testing simultaneously.

Answer: B


NEW QUESTION # 182
Maintainability considerations are important in the design of:
Response:

  • A. Unmanned satellites.
  • B. Integrated circuits.
  • C. Modern automobiles.
  • D. Consumer televisions.

Answer: C


NEW QUESTION # 183
Censoring of data occurs when
Response:

  • A. Data collection is time-truncated.
  • B. Questionable methods of data collection are used.
  • C. Product data are sequenced and questionable
  • D. Product data are considered biased.

Answer: A


NEW QUESTION # 184
Field data for 20 mechanical suspension systems showed 3 failure during the 12 month warranty period.
When failure occurred they were repair within 2 days and the system returned to operation. If the time of failure for the failed system were 4.4 moths, 6.3 months, and 10.7 months after placement in the field, what is the 90% lower confidence estimate on MTBF?
Response:

  • A. 4.1 months
  • B. 33.7 months
  • C. 43.5 months
  • D. 35.9 months

Answer: D


NEW QUESTION # 185
What percentage of the material is expected to fail?
Response:

  • A. 2.0%
  • B. 1.4%
  • C. 8.1%
  • D. 2.3%

Answer: D


NEW QUESTION # 186
The mean of the normal logarithms of the repair times is 4.3 hours with a standard deviation of 0.7 hours. What is the maintainability for an allowed repair time of 120 hours?
Response:

  • A. 0.757
  • B. 0.187
  • C. 0.243
  • D. 0.976

Answer: A


NEW QUESTION # 187
A fault tree analysis (FTA) is a design analysis technique constructed from a "top event". A basic problem with this technique in comparison to a FMECA would be which of the following?
Response:

  • A. Understanding logical symbols.
  • B. Needing a different FTA for each defined top event.
  • C. Assigning probabilities to the various events.
  • D. Only electronic systems can be analyzed.

Answer: B


NEW QUESTION # 188
Typical statistical distributions or confidence limits can be determined for accelerated tests. In the case of a step-stress test, the proper estimated distribution would be which of the following?
Response:

  • A. Weibull
  • B. Exponential
  • C. None, not meaningful.
  • D. Lognormal

Answer: C


NEW QUESTION # 189
For a corrective action system to be effective, which of the following is MOST important?
Response:

  • A. Warranty analysis.
  • B. Follow - up.
  • C. Design maturity.
  • D. Robustness testing.

Answer: B


NEW QUESTION # 190
......