Huawei H19-402_V1.0 exam is an excellent opportunity for professionals who want to develop their skills and expertise in data center network planning and design. HCSP-Presales-Data Center Network Planning and Design V1.0 certification is recognized globally and is highly valued by organizations across different industries. H19-402_V1.0 exam is designed to test candidates on their ability to plan and design data center networks that are secure, scalable, and reliable. Candidates who pass the exam are recognized as experts in data center network planning and design and are highly sought after by organizations.
NEW QUESTION # 304
What are the main functional features of UPS2000-G-(6K-20K) PDU? (Multiple choice)
- A. Provide surrounding environment monitoring and alarm
- B. Realize input and output power distribution of two parallel machines
- C. Extended output socket: OT: 4C13; 2C19
- D. Provide centralized maintenance bypass for single machine or parallel system
Answer: A,B,C,D
NEW QUESTION # 305
Which of the following is the UPS used by FusionPower (prefabricated power module)?
- A. UPS5000-E
- B. UPS5000-H
- C. UPS5000-A
- D. PS5000-s
Answer: B
NEW QUESTION # 306
UPS5000-E has an output power factor of up to (), higher 11% than traditional UPS.
- A. 0
- B. 0.95
- C. 0.9
Answer: A
NEW QUESTION # 307
NetEco management system can be deployed on () virtual machine software, saving the purchase of servers through virtualization deployment?
- A. VMware
- B. Parallels
- C. Ms Hyper-v
- D. KVM
Answer: A
NEW QUESTION # 308
Huawei micromodules can seal cold channels and hot channels.
- A. False
- B. True
Answer: B
NEW QUESTION # 309
In a certain project, the customer hopes to show the data center operation and maintenance status to external visitors. In this case, the () function of the NetEco management system can be used to achieve this?
- A. Report Management
- B. Large screen display
- C. Energy Efficiency Management
- D. Alarm Management
Answer: B
NEW QUESTION # 310
The NetEco6000 management system uses the above security mechanisms to ensure network security and prevent the leakage of sensitive business data? (Multiple choice)
- A. Permission Control
- B. Transmission Security
- C. None of the above
- D. Storage Security
Answer: A,B,D
NEW QUESTION # 311
Channel delivery authorization B2 means that all CSPs at or above the certification level can deliver
- A. False
- B. True
Answer: B
NEW QUESTION # 312
Why do Fusionlodule500&FusionModule800 generally recommend typical configuration solutions to customers? (Multiple choice)
- A. The existing typical configuration scheme can basically cover most small computer room usage scenarios
- B. Typical solutions are more competitive
- C. Typical configuration solutions have shorter delivery cycles than customized solutions
- D. Typical configuration solutions are more commercially viable than customized solutions
Answer: A,B,C,D
NEW QUESTION # 313
FusionModule800 can only support downlink routing
- A. True
- B. False
Answer: B
NEW QUESTION # 314
UPS5000-A/E 400KVA and above models are divided into standard version and enhanced version.
The standard version is equipped with () isolation switch.
- A. Output
- B. Repair
- C. Main input
- D. Bypass Input
Answer: B
NEW QUESTION # 315
What are the following models/capacities of Huawei's power module FusionPower6000? (Multiple choice)
- A. 1.6MW
- B. 2.0MW
- C. 1.2MW
- D. 2.4MW
Answer: A,C,D
NEW QUESTION # 316
The modules used in UPS5000-E-75K half-height modular UPS are also 25k.
- A. False
- B. True
Answer: B
NEW QUESTION # 317
Configure the UPS cables. The total current carrying capacity of the cables should be greater than the rated current of the UPS to meet the project requirements.
- A. False
- B. True
Answer: B
NEW QUESTION # 318
UPS2000-G1~3kVA supports () parallel operation
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION # 319
If UPS5000-A-400/500K is equipped with a set of 40 12V batteries, how many battery inspection meters are needed?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION # 320
The new room-level air-cooled series is based on the indoor return air 35C, outdoor temperature
35C working conditions, the cooling capacity range is? (Multiple choice)
- A. 60kw
- B. 45kW
- C. 90kw
- D. 100kW
- E. 50kW
- F. 120kW
Answer: A,B,C,F
NEW QUESTION # 321
What are the following tasks in data center operation and maintenance? (Multiple choice)
- A. Real-time monitoring
- B. Routine Maintenance
- C. Major overhaul
- D. Emergency drills
Answer: A,B,C,D
NEW QUESTION # 322
One indoor unit of Huawei Netcol air-cooled air conditioner can correspond to multiple outdoor units.
- A. True
- B. False
Answer: B
NEW QUESTION # 323
The new room-level air-cooling series is a full frequency conversion architecture
- A. False
- B. True
Answer: B
NEW QUESTION # 324
What is the output power factor of UPS2000-A-(1K-3K)?
- A. 0.7
- B. 0.8
- C. 0.99
- D. 0.9
Answer: B
NEW QUESTION # 325
Which of the following is incorrect about the function description of iMiManager in FusionModule2000v3.0?
- A. Support automatic asset configuration
- B. When the server is listed, the best server location can be recommended
- C. All of the above
- D. Can display capacity data such as space, power distribution, and cooling
Answer: C
NEW QUESTION # 326
Relevant standards stipulate that the AC cable voltage drop needs to be controlled within 3%. When designing a UPS system, it is recommended that the AC insulation voltage drop be controlled within ().
- A. 0.01
- B. 0.02
- C. 0.05
- D. 0.03
Answer: A
NEW QUESTION # 327
What is the energy saving effect of Huawei's Icooling?
- A. 8%
- B. 5%
- C. 15%
- D. 10%
Answer: C
NEW QUESTION # 328
......