Free 2021 HPE ATP - Hybrid IT Solutions V2 HPE0-V14 dumps are available on Google Drive shared by Exam4Docs
Welcome to download the newest Exam4Docs HPE0-V14 PDF dumps: https://www.exam4docs.com/HPE0-V14-study-questions.html ( 290 Q&As)
HP HPE0-V14: Building HPE Hybrid IT Solutions Certification Path
The HP HPE0-V14: Building HPE Hybrid IT Solutions Certification is one of the highest levels of certification mainly focusing on the Advanced Programming concepts.
If you pass your exam and meet all requirements for a credential, you will receive an e-mail from SAS within 72 business hours with instructions providing access to your certificate and logo through the SAS Certification Manager. You will also receive an email from Acclaim with access to your digital badge. For questions regarding access to either of these, please contact [email protected].
NEW QUESTION 29
You are reviewing a series of MSA2052 storage designs for a customer's remote locations. Their largest remote site requires the highest possible level of internal data protection with at least 20 TB of storage. Which disk drive design is adequate for this site?
- A. 10 HPE MSA 2 TB drives, configured with RAID0
- B. 8 HPE MSA 2 TB drives, configured with RAID5
- C. 14 HPE MSA 2 TB drives, configured with RAID1
- D. 12 HPE MSA 2 TB drives, configured with RAID6
Answer: D
NEW QUESTION 30
Refer to the exhibit.
A customer has two HPE ProLiant DL380 Gen10 servers running as an Oracle cluster. They are trying to reduce licensing costs and want to move to the best processor available from the list to minimize licensing costs while still providing a high level of performance for the Oracle database.
Which DL380 Gen10 processor would you recommend?
- A. Intel Xeon-Platinum 8280
- B. Intel Xeon-Platinum 8253
- C. Intel Xeon-Platinum 8280M
- D. Intel Xeon-Platinum 8256
Answer: D
NEW QUESTION 31
Read the question, and then refer to the exhibit.
display interface Ten-GigabitEthernet 1/0/1 Ten-GigabitEthernet1/0/1 Current state: Administratively DOWN Line protocol state: DOWN IP packet frame type: Ethernet II, hardware address: d894-03fb-793d Description: Ten- GigabitEthernet1/0/1 Interface Bandwidth: 10000000 kbps Loopback is not set Media type is stack wire, port hardware type is STACK_SFP_PLUS Unknown-speed mode, unknown-duplex mode Link speed type is autonegotiation, link duplex type is autonegotiation Flow-control is not enabled Maximum frame length: 10000 Allow jumbo frames to pass Broadcast max-ratio: 100% Multicast max-ratio: 100% Unicast max-ratio: 100% PVID: 1 MDI type: Automdix Port link-type: Trunk VLAN Passing:
10, 20 VLAN permitted: 10, 20 Trunk port encapsulation: IEEE 802.1q Port priority: 0 Last link flapping: 0 hours 0 minutes 18 seconds Last clearing of counters: Never Peak input rate: 78 bytes/sec, at 2011-03-31 04:55:57 Peak output rate: 15 bytes/sec, at 2011-03-30 23:00:57 Last 300 second input: 0 packets/sec
67 bytes/sec - % Last 300 second output: 0 packets/sec 14 bytes/sec - % Input (total): 62670 packets, 8565340 bytes 0 unicasts, 0 broadcasts, 62670 multicasts,
0 pauses Input (normal): 62670 packets, - bytes 0 unicasts, 0 broadcasts, 62670 multicasts, 0 pauses Input: 0 input errors, 0 runts, 0 giants, 0 throttles 0 CRC,
0 frame, - overruns, 0 aborts - ignored, - parity errors Output (total): 3707 packets, 1294835 bytes 0 unicasts, 0 broadcasts, 3707 multicasts, 0 pauses Output (normal): 3707 packets, - bytes 0 unicasts, 0 broadcasts, 3707 multicasts, 0 pauses Output: 0 output errors, - underruns, - buffer failures 0 aborts, 0 deferred, 0 collisions, 0 late collisions 0 lost carrier, - no carrier A customer added a new switch to their network. They connected it using interface Ten-GigabitEthernet 1/0/1.
They are using VLAN 10 and 20 for the devices in their network.
The new switch was fully operational. Then, the customer experienced a power failure later that day and could not reach any device on the new switch after the power returned.
From the output in the exhibit, would could be the issue?
- A. The interface is administratively down.
- B. The interface loopback is not set.
- C. The interface is configured for a PVID of VLAN 1.
- D. The interface link-speed and duplex are unknown.
Answer: C
Explanation:
Explanation/Reference: https://assets.ext.hpe.com/is/content/hpedam/a00004216enw
NEW QUESTION 32
A customer with limited IT administration resources needs a complete HPE server, storage, and networking solution. The solution must be able to be deployed in an hour or less through a simple, wizard-based setup. They want to manage the HPE solution through a simple, integrated plug-in to vCenter, since their IT staff members are already familiar with vCenter.
Which HPE solution best meets the customer requirements?
- A. HPE OneView for VMware vCenter
- B. HPE Proliant for Microsoft Azure Stack
- C. HPE Nimble Storage dHCI
- D. HPE ConvergedSystem 750
Answer: A
NEW QUESTION 33
Match each workload profile description with the corresponding profile. (Select all that apply.)
Answer:
Explanation:
NEW QUESTION 34
A local state college is implementing a new VDI cluster to support computer and testing labs. They have the following requirements:
* Three VMware ESXi Hosts, each with one AMD processor, 1 TB of RAM, 16 Gbps FC Dual Port HBA.
* HPE Nimble AF20 with 17 TB usable capacity.
* Integration into an existing HPE FlexFabric 5710 and HPE SN3000B Fibre Channel SAN switches.
* The solution must fit in 7U of rack space. If the customer needs more capacity in the future, they will use scale-out growth.
Which server model should you recommend to this client?
- A. HPE DL380
- B. HPE DL325
- C. HPE DL360
- D. HPE DL385
Answer: D
NEW QUESTION 35
You are installing a combined server and storage solution at a customer location. What must you keep in mind regarding the typical requirements for the location? (Choose two.)
- A. There must be at least a 10 cm (4 in) clearance space at the front and back of the components within the racks
- B. Room temperature must not exceed 35 °C (95 °F)
- C. Rack doors must be unlocked for easy component removal and maintenance
- D. UPSs should be installed at the top of the rack for top mounted power feed
- E. Rack tie kit should be installed on the rack for proper airflow
Answer: A,B
NEW QUESTION 36
You need to review a warning on a Nimble storage array.
Click on the menu option that displays this information.
Answer:
Explanation:
NEW QUESTION 37
You plan to install an HPE ProLiant DL360 Gen10 in an environment with an ambient temperature of 45 C (113 F).
Which additional option is required?
- A. M.2 Solid State Enablement Kit
- B. Gen10 Bezel Kit
- C. 500W Flex Slot Platinum PS Kit
- D. High Performance Fan Kit
Answer: D
NEW QUESTION 38
You are troubleshooting a POST error on a HPE ProLiant rack-mount server. HPE support has directed you to test a minimum hardware configuration.
Which components should you remove? (Choose two.)
- A. CMOS battery
- B. redundant processors
- C. all expansion boards
- D. all external storage media
- E. all cooling fans
Answer: B,D
NEW QUESTION 39
You are troubleshooting an HPE ProLiant rack-mount server. You need to run diagnostic tests on local storage.
Which HPE tool should you use?
- A. Smart Storage Administrator
- B. iLO
- C. OneView
- D. Intelligent Management Center
Answer: D
NEW QUESTION 40
A customer needs to increase the availability and bandwidth of network connectivity to their servers.
Which switch feature meets the customer's needs?
- A. Link Aggregation and Control Protocol (LACP)
- B. Jumbo frames
- C. Virtual Local Area Network (VLAN)
- D. Remote direct memory access over Converged Ethernet (RoCE)
Answer: A
NEW QUESTION 41
Which protocol can be used to access a shared directory on a network-attached storage device?
- A. SNMP
- B. BGP
- C. FCP
- D. SMB
Answer: D
Explanation:
Explanation/Reference: https://en.wikipedia.org/wiki/Network-attached_storage
NEW QUESTION 42
A customer needs a solution that supports rapid provisioning changes on physical bare-metal servers and on a virtualization hypervisor. They are considering migrating to a new solution that supports software-defined storage.
Which HPE compute platform should the customer implement?
- A. ProLiant DL
- B. SimpliVity
- C. Synergy
- D. BladeSystem
Answer: C
NEW QUESTION 43
You configured a port on an HPE FiexFabric 5900 series switch that is connected to a VMware ESXi server to support multiple VLANs interface Ten-GigabitEthernet 1/0/11 description server ESXiOl-ethl port link-type trunk port trunk permit vlan 50 port trunk permit vlan 2 port trunk pvid vlan 50 Given the configuration above, what should happen to any untagged traffic coming from the VMware ESXI host?
- A. It will be dropped
- B. It will be transmitted in vlan 50.
- C. It will be transmitted in vlan 1.
- D. It will be transmitted in vlan 2
Answer: B
NEW QUESTION 44
A customer needs a storage to run a database in an environment with many virtual machines. You have recommended a HPE MSA 2042 solution, but the customer has reservations about whether the MSA 2042 can deliver the required performance.
Which feature of MSA 2042 will help to improve iOP performance?
- A. 1 Gb iSCSI connectivity
- B. RAID 6 Advanced Data Guarding (ADG)
- C. thin provisioning
- D. optimal flash acceleration
Answer: D
NEW QUESTION 45
Refer to the exhibit.
A customer has two HPE ProLiant DL380 Gen10 servers running as an Oracle cluster. They are trying to reduce licensing costs and want to move to the best processor available from the list to minimize licensing costs while still providing a high level of performance for the Oracle database.
Which DL380 Gen10 processor would you recommend?
- A. Intel Xeon-Platinum 8280
- B. Intel Xeon-Platinum 8256
- C. Intel Xeon-Platinum 8253
- D. Intel Xeon-Platinum 8280M
Answer: C
Explanation:
Explanation/Reference:
NEW QUESTION 46
Match the speed and protocol with the appropriate component.
Answer:
Explanation:
Reference:
https://buy.hpe.com/us/en/options/transceivers/server-transceivers/hpe-sfp-transceivers/p/7263510 https://itg.buy.hpe.com/emea_europe/en/options/transceivers/server-transceivers/server-transceivers/hpe- qsfp28-transceivers/p/1008789459
NEW QUESTION 47
Match the feature to the lowest iLO5 license in which it is available
Answer:
Explanation:
Last - last
3-2
1-1
3-3
NEW QUESTION 48
......
Tested Material Used To HPE0-V14: https://www.exam4docs.com/HPE0-V14-study-questions.html
Following are some new HPE0-V14 Real Exam Questions!: https://drive.google.com/open?id=14Zkl01W4S7A1Rs9mqKfUDzurO7QQ5qzD