
Get Dec-2025 updated Exam CTS-D Dumps with New Questions
100% Pass Guarantee for CTS-D Exam Dumps with Actual Exam Questions
AVIXA CTS-D - Design Exam Syllabus Topics:
| Topic | Weight |
|---|---|
| Duty A: Conducting a Needs Assessment | 16.8% |
| Task 1: Identify Decision-makers and Stakeholders | 1.6% |
| Task 2: Identify Skill Level of End Users | 2.4% |
| Task 3: Educate AV Clients | 1.6% |
| Task 4: Review Client Technology Master Plan | 3.2% |
| Task 5: Identify Client Expectations | 4% |
| Task 6: Identify Scope of Work | 4% |
| Duty B:Coordinating with Other Professionals to Develop Project Documentation | 23.2% |
| Task 1: Review A/E (architectural and engineering) drawings | 4% |
| Task 2: Coordinate with architectural/interior design professionals | 4% |
| Task 3: Coordinate with Mechanical Professionals | 1.6% |
| Task 4: Coordinate with Structural Professionals | 1.6% |
| Task 5: Coordinate with Electrical Professionals | 3.2% |
| Task 6: Coordinate with lighting professionals | 2.4% |
| Task 7: Coordinate with IT and network security professionals | 4.0% |
| Task 8: Coordinate with acoustical professionals | 1.6% |
| Task 9: Coordinate with life safety and security professionals | 0.8% |
| Duty C: Developing AV Designs | 48% |
| Task 1: Create Draft AV Design | 10.4% |
NEW QUESTION # 22
When installing conduit, it is important to remember that the conduit will require the following:
Response:
- A. Room to expand 45 percent because of latent heating
- B. A slip sleeve to ensure adequate air space for cable
- C. Adequate mounting support to withstand cable pulling
- D. Internal insulation, usually an injected polyurethane jell
Answer: C
NEW QUESTION # 23
You need to project an image that has a 4:3 aspect ratio. You measure the screen height and determine that it is 2,286 mm high and 3,048 mm wide. Can you use this screen for the 4:3 image?
Response:
- A. No
- B. Not enough information to determine
- C. Yes
- D. All of the above
Answer: C
NEW QUESTION # 24
Which is the best way to ensure an AV system meets client needs during the design phase?
- A. Focus only on budget constraints
- B. Use default industry standards
- C. Rely on previous project templates
- D. Conduct detailed needs analysis and site surveys
Answer: D
NEW QUESTION # 25
What systems should be included when drawing AV network diagrams?
Response:
- A. The connected devices, cabling system, wireless links
- B. Signal control, audio auditing, laser conduit
- C. Sprinkler system, ceiling plan, touch panel, plumbing runs
- D. Lighting and projection, noise synching, ambient noise reduction
Answer: A
NEW QUESTION # 26
Which of the following is a benefit of using digital AV signals over analog?
- A. Lower bandwidth requirements
- B. Easier to amplify without distortion
- C. Susceptibility to interference
- D. Higher signal degradation over distance
Answer: B
NEW QUESTION # 27
Twisted-pair cables offer protection from electromagnetic interference by __________.
Response:
- A. Exposing each wire to the same outside interference, allowing it to be canceled at the input circuit
- B. Comparing the signal that arrives at the destination device against a checksum
- C. Shielding each pair inside a foil or braided shield
- D. Physically separating conductors from higher-voltage signals
Answer: A
NEW QUESTION # 28
Which of the following best describes a "needs analysis" in AV system design?
- A. Determining the technical specifications for equipment
- B. Gathering and understanding client requirements and project goals
- C. Writing the installation manual
- D. Developing a budget estimate
Answer: B
NEW QUESTION # 29
_________ compression is common for networked AV applications, such as streaming media and IP telephony.
Response:
- A. Lossless
- B. Apple QuickTime
- C. Intraframe
- D. Lossy
Answer: D
NEW QUESTION # 30
What is the primary purpose of an AV system "site survey"?
- A. To finalize budget
- B. To install equipment
- C. To assess physical space and infrastructure constraints and opportunities
- D. To conduct user training
Answer: C
NEW QUESTION # 31
Which of the following is a typical deliverable in the AV system design phase?
- A. System design drawings and specifications
- B. User training manuals
- C. Installation checklist
- D. Maintenance contracts
Answer: A
NEW QUESTION # 32
Which component in an AV system is responsible for controlling multiple devices like projectors, screens, and lighting?
- A. DSP
- B. Switcher
- C. Amplifier
- D. Control system processor
Answer: D
NEW QUESTION # 33
To "train the trainer" is to __________.
Response:
- A. Host classes at the designer's office
- B. Train the client on aspects of the user interf
- C. Train individuals at the client location who can train other users
- D. Learn the AV system so you can train the client
Answer: C
NEW QUESTION # 34
A conference room requires video conferencing and AV presentation capabilities. Which of the following design elements are defined by the architectural dimensions and orientation of the room?
Response:
- A. Display brightness
- B. Display size
- C. Display type
- D. Display aspect ratio
Answer: B
NEW QUESTION # 35
Which of the following best defines "scalability" in AV system design?
- A. The system's ability to expand or upgrade in the future without major redesign
- B. The initial cost of the system
- C. The physical size of equipment
- D. The weight of cables
Answer: A
NEW QUESTION # 36
Which type of audio cable is typically used for unbalanced audio signals?
- A. Cat6
- B. RCA
- C. HDMI
- D. XLR
Answer: B
NEW QUESTION # 37
Where will the floor box dimensional and exact installation information be found?
Response:
- A. Electrical coordination drawings
- B. Conduit riser diagrams
- C. Floorplan drawings
- D. Detail drawings
Answer: D
NEW QUESTION # 38
If a font height is 2 in (50 mm), the screen height is 60 in (1,525 mm), and screen resolution is 1080 pixels high, what is the font size in pixels?
Response:
- A. 40 point
- B. 32 point
- C. 36 point
- D. 28 point
Answer: C
NEW QUESTION # 39
What is the primary role of a "mixer" in an audio system?
- A. To amplify signals
- B. To convert audio to digital format
- C. To route video signals
- D. To combine multiple audio inputs into one or more outputs
Answer: D
NEW QUESTION # 40
What other type of light, besides light coming directly from a source, must be measured?
Response:
- A. Fluorescent
- B. Ambient
- C. Distorted
- D. Refracted
Answer: B
NEW QUESTION # 41
Which document defines detailed technical specifications and requirements for AV equipment procurement?
- A. Maintenance plan
- B. System design document
- C. Training manual
- D. Request for proposal (RFP)
Answer: D
NEW QUESTION # 42
The layout of a distributed loudspeaker system needs to be calculated using the formula for partial (minimum) spacing of loudspeakers. Which button on a specific calculator is required?
Response:
- A. Square root
- B. STO
- C. 10^x
- D. Divide
Answer: A
NEW QUESTION # 43
When testing the audio system to ensure that the system is equalized you will need an SPL meter, a signal generator and___.
Response:
- A. An oscilloscope
- B. A test pattern generator
- C. A real time analyzer
- D. A pink noise generator
Answer: C
NEW QUESTION # 44
What is the advantage of converting an analog signal to digital?
Response:
- A. Digital signals have more signal headroom.
- B. Digital signals carry audio and video feeds that analog will not.
- C. Digital signals can address signal degradation, storage, and recording issues.
- D. Digital signals are more energy efficient to broadcast.
Answer: C
NEW QUESTION # 45
If an amplifier draws 7 amperes (A) at 120 V of alternating current (VAC), without considering amplifier efficiency, what is the heat load it generates?
Response:
- A. 1505 BTU/hr
- B. 1212 BTU/hr
- C. 2856 BTU/hr
- D. 840 BTU/hr
Answer: C
NEW QUESTION # 46
......
CTS-D exam dumps with real AVIXA questions and answers: https://www.exam4docs.com/CTS-D-study-questions.html
Today Updated CTS-D Exam Dumps Actual Questions: https://drive.google.com/open?id=1FlgsGZPgl1vbgXBuDXXUHWmafd3CTJBk

