NEW QUESTION # 32
How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

  • A. By manually activating the corresponding Business Feature in case Best Practices are not
  • B. By installing the corresponding enhancement pack and activating the related business function
  • C. Through Best Practices scope items 4HH and 4HI.
  • D. Phase-based maintenance is always active in all S/4HANA 2021 editions and above

Answer: C,D


NEW QUESTION # 33
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?

  • A. Analyze confirmed maintenance orders that have NOT been settled.
  • B. Display approved purchase requisitions for which purchase orders have been generated.
  • C. Display approved purchase requisitions for which NO purchase orders have been generated
  • D. Analyze overdue maintenance orders that have NOT been finally confirmed
  • E. Analyze maintenance orders that are still in planning and have NOT been released.

Answer: B,C,D


NEW QUESTION # 34
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

  • A. Scheduling indicator
  • B. End Date for Scheduling
  • C. Call horizon
  • D. Scheduling period

Answer: D


NEW QUESTION # 35
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question

  • A. The assignment of a control key with key externally processed operation is sufficient.
  • B. The assignment of a control key with the service indicator set is mandatory
  • C. The usage of a model service specification is mandatory.
  • D. The actual value entry can be recorded only via the service entry sheet

Answer: B,C


NEW QUESTION # 36
How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question

  • A. By assigning a PFCG role with an SAP Fiori catalog
  • B. By assigning a portal role with an SAP Fiori catalog
  • C. By assigning the tiles directly
  • D. By assigning a PFCG role with an SAP Fiori tile group

Answer: A,D


NEW QUESTION # 37
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

  • A. An object list must have been generated manually or automatically.
  • B. An Inspection Plan and a technical object must be assigned to the same class.
  • C. A PM task list with inspection point type must be assigned to the maintenance order
  • D. A checklist type must be assigned to the maintenance order header.

Answer: B,C


NEW QUESTION # 38
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question

  • A. Update the estimated costs
  • B. Lock or unlock the order
  • C. Change the planned costs
  • D. Change the settlement rule

Answer: B,D


NEW QUESTION # 39
What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.

  • A. A one-time shift of a maintenance package
  • B. The first due date of a maintenance package
  • C. A preliminary buffer shifting the reference date of the maintenance order
  • D. The call date for the maintenance order

Answer: B


NEW QUESTION # 40
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question

  • A. Set the call horizon to 90 days.
  • B. Set the call horizon to 25%.
  • C. Set the offset to 3 months
  • D. Set the call horizon to 75%

Answer: B,C


NEW QUESTION # 41
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

  • A. Cancel status Released.
  • B. Change the pronty
  • C. Change the estimated costs.
  • D. Book a goods receipt.

Answer: B,D


NEW QUESTION # 42
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Call object
  • B. Maintenance activity type
  • C. Order type
  • D. Completion data
  • E. Change documents

Answer: A,D,E


NEW QUESTION # 43
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. Actual finish date of the maintenance order
  • B. Planned date of the next call, independent of maintenance order dates
  • C. The date of the final confirmation
  • D. Technical completion date of the maintenance order

Answer: D


NEW QUESTION # 44
What do you have to consider regarding a cross-plant planning scenario?

  • A. Multiple maintenance plants are assigned to a planning plant (n: 1).
  • B. Only a maximum number of five maintenance plants can be assigned to a planning plant.
  • C. It is only possible within the same company code.
  • D. Multiple planning plants are assigned to a maintenance plant (m: 1).

Answer: A


NEW QUESTION # 45
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Scheduling indicator
  • B. Factory calendar
  • C. Start date
  • D. Scheduling period

Answer: C,D


NEW QUESTION # 46
You schedule a Maintenance Service Plan. Which call object is generated?

  • A. Maintenance Order which is linked to a Service Order Item
  • B. Customer Service Order with assigned DIP profile
  • C. Maintenance Order which is linked to a Service Order Header
  • D. Customer Service Order with an external order operation

Answer: B


NEW QUESTION # 47
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question

  • A. The cost center of the related maintenance work center
  • B. The individual maintenance of the cost center in the equipment master record
  • C. The reference functional location of the superior functional location
  • D. The cost center of the superior equipment

Answer: B,D


NEW QUESTION # 48
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

  • A. Estimated annual performance
  • B. Start counter reading
  • C. Scheduling period
  • D. Counter overflow reading

Answer: A,B


NEW QUESTION # 49
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

  • A. A purchase requisition will ALWAYS be created as soon as the order is saved.
  • B. A purchase requisition can be created automatically as soon as the order is saved.
  • C. A goods receipt can be posted after the maintenance order is technically completed.
  • D. The maintenance order can be set to TECO before the invoice is created
  • E. A purchase order is created automatically as soon as the order is saved.

Answer: A,B,D


NEW QUESTION # 50
Which SAP UI technology is used for the Report and Repair Malfunction app?

  • A. SAP GUI for HTML
  • B. Web Dynpro
  • C. Business Server Pages
  • D. SAPUI5

Answer: D


NEW QUESTION # 51
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question

  • A. Display maps Display and maintain technical objects
  • B. Change BOM Create a work order on the ESRI map
  • C. Schedule resources Change task list
  • D. Confirm time sheets Attach documents

Answer: A,D


NEW QUESTION # 52
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?

  • A. Via the SAP Fiori app "Maintenance Scheduling Board"
  • B. Via the SAP Fiori app "Manage Maintenance Order List"
  • C. Within the SAP Fion-based background job
  • D. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"

Answer: A,B


NEW QUESTION # 53
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question

  • A. Preconfigured Core Data Service (CDS) containing SQL views
  • B. SAP Business Objects Business Intelligence for Visualization
  • C. SAP Business Objects as a part of SAP Business Warehouse (BW)
  • D. A collection of tools that are not included with core SAP S/4HANA

Answer: A,C


NEW QUESTION # 54
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

  • A. Scheduling indicator
  • B. Cycle modification factor
  • C. Maintenance package offset
  • D. Package hierarchy

Answer: C


NEW QUESTION # 55
......